+359 875 300 600 Inquire
Placeholder: glass towers seen from below. Not the NEW TOWER building.

Varna · 2 Devnya Street

25 floors.
One horizon.

A mixed-use residence in the centre of Varna. Two sections, a private park, and a day that stays on the address.

Choose a home

This frame is an atmospheric placeholder. Official visuals replace it in the same position.

Sky-High Standards

To the project

01 — The project

High above the street. Close to everything.

NEW TOWER gathers homes, services and a private park on one address. Section A is for living in. Section B is an investment you can rent. Both face one horizon.

302homes
300+parking spaces
6,000 m²retail and offices
2,000 m²private park
Placeholder: a quiet living room in wood and soft light.
Atmospheric frame · placeholder

Section A

25 floors to live in.

The larger homes, from 51 to 142 m², are planned for permanent living. On level 3, terraces reach 60 m². On level 25, living rooms reach about 80 m², with a maisonette option.

The project
Placeholder: a bright living room with a large window.
Atmospheric frame · placeholder

Section B

16 floors for income.

Compact homes from 51 to 84 m², on the same address, with the same park and service. Suited to long or short lets, with rental management available.

Investment

Material

Glass, stone, wood, brass.

Facade

Glass that holds the sky, and a ventilated layer for the seasons. Stone and wood warm the shared floors.

Structure

Monolithic reinforced concrete to Eurocode 8. Full insulation and premium common areas.

Handover

Shell standard: plaster, screed, plumbing to cap, complete electrical installation, metal entrance door.

Aspect

Sunrise to the east. Sunset to the west.

190+

homes see the sea

110

look toward the lake

75

have both — a double horizon

Placeholder: a sea horizon at sunset. Not Varna beach.
Atmospheric frame · placeholder

Location

The cathedral, the beach and Kaufland belong to the address.

The complex sits in the central city: a short walk from the cathedral, the sea station and the city beach. Kaufland is in the neighbouring building. The shore is about a 15-minute walk.

The location

Investment

Section B holds the rent. The schedule holds the rhythm.

30%on the preliminary contract
60%during construction
10%at Act 16

Preferential terms may be available through the sales desk. The figures describe the scheme, not a specific offer.

Works

May 2026. Thirty-six months.

Groundbreaking is planned for May 2026. The site diary is ready and will fill after the start. Dates through to Act 16 are a forecast.

Diary

360°

The 3D tour has a reserved place.

An interactive walk through the building and the typical homes will be embedded here. The page exists. The tour does not, yet.

360°

Gallery

Atmosphere, until the official frames arrive.

Placeholder: towers in mist, looking up.
Atmospheric frame · placeholder
Placeholder: a garden. Not the complex park.
Atmospheric frame · placeholder
Placeholder: the sea at sunset.
Atmospheric frame · placeholder
Full gallery

Inquire

A conversation with sales.

Call, write, or leave an inquiry. The demo form does not send a letter — on the live site it reaches sales@newtower.bg.